ECU Libraries Catalog

Final environmental impact statement for hydropower relicensing : Pelton Round Butte Hydroelectric Project, FERC project no. 2030-036, Oregon.

Author/creator United States. Division of Hydropower Licensing
Other author/creatorPortland General Electric Company.
Other author/creatorConfederated Tribes of the Warm Springs Reservation of Oregon.
Format Book and Microform
Publication InfoWashington, D.C. (888 First Street, N.E,. Washington, 20426) : Federal Energy Regulatory Commission, Office of Energy Projects, Division of Hydropower Licensing, [2004]
Description1 volume (various pagings) : illustrations, maps ; 28 cm
Subject(s)
Cover title Final environmental impact statement : Pelton Round Butte Hydroelectric Project
Portion of title Pelton Round Butte Hydroelectric Project
General note"Joint applicants: Portland General Electric and the Confederated Tribes of the Warm Springs Reservation of Oregon."
General note"June 2004."
General noteShipping list no.: 2004-0525-M.
General note"FERC/FEIS-0165F."
Bibliography noteIncludes bibliographical references.
Reproduction noteJoyner- Microfiche. [Washington, D.C.] : Supt. of Docs., U.S. G.P.O., 2004 5 microfiches : negative.
GPO item number0429-V-03 (MF)
Govt. docs number E 2.11/3:0165 F

Available Items

Library Location Call Number Status Item Actions
Joyner Microforms B300 E 2.11/3:0165 F ✔ Available Place Hold

Related Titles