Final environmental impact statement for hydropower relicensing : Pelton Round Butte Hydroelectric Project, FERC project no. 2030-036, Oregon.

Author/creator United States
Other author Portland General Electric Company.
Other author Confederated Tribes of the Warm Springs Reservation of Oregon.
Format Microform
Publication InfoWashington, D.C. (888 First Street, N.E,. Washington, 20426) : Federal Energy Regulatory Commission, Office of Energy Projects, Division of Hydropower Licensing, [2004]
Description1 volume (various pagings) : illustrations, maps ; 28 cm
Subjects

Cover title Final environmental impact statement : Pelton Round Butte Hydroelectric Project
Portion of title Pelton Round Butte Hydroelectric Project
General note"Joint applicants: Portland General Electric and the Confederated Tribes of the Warm Springs Reservation of Oregon."
General note"June 2004."
General noteShipping list no.: 2004-0525-M.
General note"FERC/FEIS-0165F."
Bibliography noteIncludes bibliographical references.
Reproduction noteJoyner- Microfiche. [Washington, D.C.] : Supt. of Docs., U.S. G.P.O., 2004 5 microfiches : negative.
GPO item number0429-V-03 (MF)
Govt. docs number E 2.11/3:0165 F

Availability

Library Location Call Number Status Item Actions
Joyner Microforms B300 E 2.11/3:0165 F ✔ Available