Uranium enrichment : decontamination and decommissioning fund is insufficient to cover cleanup costs : report to congressional committees.

Author/creator United States
Format Electronic
Publication Info[Washington, D.C.] : U.S. General Accounting Office, [2004]
Supplemental Contenthttps://purl.fdlp.gov/GPO/LPS51601
Subjects

Portion of title Decontamination and decommissioning fund is insufficient to cover cleanup costs
General noteTitle from title screen (viewed on July 15, 2004).
General note"July 2004."
General notePaper version available from: U.S. General Accounting Office, 441 G St., NW, Rm. LM, Washington, D.C. 20548.
General note"GAO-04-692."
General noteGPO Cataloging Record Distribution Program (CRDP).
Bibliography noteIncludes bibliographical references.
Technical detailsMode of access: Internet from GPO Access web site. Address as of 7/15/04: http://frwebgate.access.gpo.gov/cgi-bin/getdoc.cgi?dbname=gao&docid=f:d04692.pdf; current access available via PURL.
Technical rpt numberGAO-04-692
GPO item number0546-D (online)
Govt. docs number GA 1.13:GAO-04-692
Stock numberGAO (202)512-6000 (voice); (202)512-6061 (Fax); (202)512-2537 (TDD) paper copy

Availability

Library Location Call Number Status Item Actions
Electronic Resources Access Content Online ✔ Available