Cascade-Siskiyou National Monument : draft resource management plan/environmental impact statement.

Contents v. 1 Main text -- v. 2 Maps and appendices.
General noteCover title.
General note"May 2002."
General noteShipping list no.: 2004-0188-M.
General noteIncludes index.
General note"BLM/OR/WA/PL-01/017+1792"--P. [2] of cover.
Bibliography noteIncludes bibliographical references (p. 291-305).
Other formsAlso available via Internet from the BLM web site. Address as of 4/19/04: http://www.or.blm.gov/csnm/Docs/Final%20Volume%201%20CSNM%20Draft%20Plan.pdf ; http://www.or.blm.gov/csnm/Docs/Volume%202%20-%20List%20of%20Maps%20and%20Appendices.pdf; current access is available via PURL(s).
Reproduction noteJoyner- Microfiche. [Washington, D.C.] : Supt. of Docs., U.S. G.P.O., 2004 10 microfiches : negative.
GPO item number0629-E-09 (MF)
GPO item number0629-E-09 (online)
Govt. docs number I 53.59:C 26/2/V.1-2/DRAFT

Availability

Library Location Call Number Status Item Actions
Joyner Microforms B300 I 53.59:C 26/2/V.1-2/DRAFT ✔ Available