Pool 25 : land ownership requirements in moving the control point to the dam / by Joseph H. Wlosinski and James T. Rogala.

SeriesTechnical report / Long Term Resource Monitoring Program ; 97-T002
Technical report (Long Term Resource Monitoring Program (Environmental Management Program)) ; 97-T002. ^A437030
General noteTitle from title screen (viewed on Mar. 11, 2003).
General note"March 1997."
General noteGPO Cataloging Record Distribution Program (CRDP).
Bibliography noteIncludes bibliographical references.
Technical detailsSystem requirements: Adobe Acrobat Reader.
Technical detailsMode of access: Internet at the USGS web site. Address as of 03/11/03: ftp://ftp.umesc.usgs.gov/pub/media%5farchives/documents/reports/1997/97t002.pdf, current access available via PURL.
Issued in other formWlosinski, Joseph H. Pool 25 : land ownership requirements in moving the control point to the dam v, 15, [1] p.
Genre/formGeographic information systems.
GPO item number0671-L-01 (online)
Govt. docs number I 74.15/2:1997-T 002

Availability

Library Location Call Number Status Item Actions
Electronic Resources Access Content Online ✔ Available