In-service performance of the Quickchange Movable Concrete Barrier system : interim report no. 2 / prepared by: M.T. Stanley.
| Author/creator | Stanley, Michael T. |
| Other author | North Carolina. Division of Highways. |
| Other author | United States. Federal Highway Administration. |
| Format | Microform |
| Publication Info | Raleigh, NC : N.C. Dept. of Transportation, Division of Highways, [1993] |
| Description | 1 volume (various pagings) : maps ; 28 cm |
| Subjects |
| General note | "March 1993." |
| General note | "Study number 170-3(18), project 170-3C, Evaluation of experimental features used in federal-aid highway construction." |
| Report note | Second interim report. July 1989-December 1992. |
| Reproduction note | Joyner- Microfiche. Raleigh, N.C. : N.C. Division of State Library, 1993. 1 microfiche : negative ; 11 x 15 cm. |
| Funding information | Prepared in cooperation with U.S. Dept. of Transportation, Federal Highway Administration. |
| Issued in other form | In-service performance of the Quickchange Movable Concrete Barrier system |
| Technical rpt# | NC-170-3(18)-2 |
| Other class# | K12 9:Q6 1992 |
| Stock number | 10100 NCTE |
Availability
| Library | Location | Call Number | Status | Item Actions |
|---|---|---|---|---|
| Joyner | NC Documents | K12 9:Q6 1992 | ✔ Available |