Guidelines for inservice testing at nuclear power plants : inservice testing of pumps and valves and inservice examination and testing of dynamic restraints (snubbers) at nuclear power plants, final report / prepared by Gurjendra S. Bedi.
Author/creator |
Bedi, Gurjendra S. author. |
Other author/creator | U.S. Nuclear Regulatory Commission. Office of Nuclear Reactor Regulation. Division of Engineering, issuing body. |
Format | Electronic and Book |
Edition | Rev. 2. |
Publication Info | Washington, DC : Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, October 2013. |
Description | 1 online resource (various pagings) |
Supplemental Content | https://purl.fdlp.gov/GPO/gpo70684 |
Subject(s) |
Click here for more information about this title
Portion of title | Inservice testing of pumps and valves and inservice examination and testing of dynamic restraints (snubbers) at nuclear power plants, final report |
General note | Title from title screen (viewed on July 29, 2016). |
General note | "NUREG-1482, rev. 2." |
General note | "Manuscript completed: September 2013; date published: October 2013." |
General note | "Performing organization: Division of Engineering, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission"--Bibliographic data sheet. |
General note | GPO Cataloging Record Distribution Program (CRDP). |
Bibliography note | Includes bibliographical references. |
Report note | Technical. |
Issued in other form | Print version: Bedi, Gurjendra S. Guidelines for inservice testing at nuclear power plants |
Technical rpt number | NUREG-1482 |
GPO item number | 1051-H-48 (online) |
Govt. docs number | Y 3.N 88:10/1482/REV.2/FINAL |
Available Items
Library | Location | Call Number | Status | Item Actions | |
Joyner | Electronic Resources | Access Content Online | ✔ Available |