ATWS analysis of Lungmen ABWR for MSIV closure transient / prepared by: Jong-Rong Wang [and three others].
| Author/creator | Wang, Jong-Rong author. |
| Other author | U.S. Nuclear Regulatory Commission issuing body. |
| Other author | He neng yan jiu suo. |
| Other author | Guo li qing hua da xue (Hsinchu City, Taiwan) |
| Format | Electronic |
| Publication | Washington, DC : U.S. Nuclear Regulatory Commission, 2014. |
| Description | 1 online resource (53 unnumbered pages) : color illustrations. |
| Supplemental Content | https://purl.fdlp.gov/GPO/gpo47568 |
| Subjects |
| Variant title | Anticipated Transient Without Scram analysis of Lungmen Advanced Boiling Water Reactor for Main Steam Isolation Valve closure transient |
| Series | International agreement report ; NUREG/IA-0438 International agreement report NUREG/IA-0438. ^A463558 |
| General note | Title from title screen (viewed Apr. 8, 2014). |
| General note | "March 2014." |
| Bibliography note | Includes bibliographical references (page 5-1). |
| Report note | Technical report. |
| Issued in other form | Print version: Wang, Jong-Rong. ATWS analysis of Lungmen ABWR for MSIV closure transient |
| GPO item number | 1051-H-41 (online) |
| Govt. docs number | Y 3.N 88:53/0438 |
Availability
| Library | Location | Call Number | Status | Item Actions |
|---|---|---|---|---|
| Electronic Resources | Access Content Online | ✔ Available |