A Case study analysis of the legal and institutional obstacles and incentives to the development of the hydroelectric power of the Boardman River at Traverse City, Michigan / prepared by The Energy Law Institute, Franklin Pierce Law Center under contract no. AS02-78RA04934.
| Other author | United States. Department of Energy. Division of Hydroelectric Resources Development. |
| Other author | Franklin Pierce Law Center. Energy Law Institute. |
| Format | Book |
| Publication Info | Washington, D.C. : U.S. Dept. of Energy, Assistant Secretary for Recource [sic] Applications, Industrial and Utility Applications and Operations, Division of Hydroelectric Resources Development, 1980. |
| Description | 146 pages ; 28 cm |
| Subjects |
| General note | "May 1980." |
| General note | "DOE/RA/04934-33." |
| Bibliography note | Includes bibliographical references. |
| Technical rpt number | DOE/RA/04934-33 |
| GPO item number | 429-T-7 |
| Govt. docs number | E 1.30:04934-33 |
Availability
| Library | Location | Call Number | Status | Item Actions |
|---|---|---|---|---|
| Joyner | Fed Docs Stacks | E 1.30:04934-33 | ✔ Available | Place Hold |