ECU Libraries Catalog

Achieving a production goal of 1 million B/D of coal liquids by 1990 / prepared by TRW Energy Systems Planning Division [and others] ... ; prepared for U.S. Department of Energy, Assistant Secretary for Fossil Energy.

Other author/creatorUnited States. Office of the Assistant Secretary for Fossil Energy.
Other author/creatorTRW Inc. Energy Systems Planning Division.
Format Book and Print
Publication InfoWashington : Dept. of Energy, Office of the Assistant Secretary for Fossil Energy ; [Springfield, Va.] : [For sale by the National Technical Information Service], 1980.
Descriptionapproximately 650 pages in various pagings : illustrations, maps ; 28 cm.
Subject(s)
Series DOE/FE ; 10490-01
General noteDraft containing: Executive summary, preliminary study of potential impediments, assessment of commercial coal liquefaction process equipment performance and supply, feasibility appraisal production of synthetic fuels from direct and indirect liquefaction processes, and synthetic transportation fuels from coals.
General noteContract no. AC01-77ER10490.
General noteMarch 1980.
Bibliography noteIncludes bibliographical references.
GPO item number429-T-4
Govt. docs number E 1.28:DOE/FE/10490-01
Stock number5285 Port Royal Rd., 22161

Available Items

Library Location Call Number Status Item Actions
Joyner Fed Docs Stacks E 1.28:DOE/FE/10490-01 ✔ Available Place Hold