Analytical investigation of the dynamics of tethered constellations in Earth orbit (phase II) : quarterly report # 2, for the period 22 June 1985 through 21 September 1985 / principal investigator Enrico Lorenzini ; co-investigators David A. Arnold, Mario D. Grossi, Gordon E. Gullahorn.

Author/creator Lorenzini, Enrico
Format Electronic
Publication InfoCambridge, Mass. : Smithsonian Institution Astrophysical Observatory ; Huntsville, Ala. : National Aeronautics and Space Administration, Marshall Space Flight Center, [1985]
Description1 online resource (35 pages) : illustrations.
Supplemental Contenthttps://purl.fdlp.gov/GPO/gpo20645

Other author/creatorArnold, David A.
Other author/creatorGrossi, Mario D.
Other author/creatorGullahorn, Gordon E.
Other author/creatorSmithsonian Astrophysical Observatory.
Other author/creatorGeorge C. Marshall Space Flight Center.
SeriesNASA-CR ; 178607
NASA contractor report ; NASA CR-178607. ^A441636
General noteTitle from title screen (viewed on March 29, 2012).
General note"October 1985."
Report noteQuarterly report # 2 22 June 1985 through 21 September 1985.
Funding informationPrepared for National Aeronautics and Space Administration, Marshall Space Flight Center contract NAS8-36606
Issued in other formMicrofiche: Lorenzini, Enrico. Analytical investigation of the dynamics of tethered constellations in Earth orbit (phase II).
GPO item number0830-H-14 (online)
Govt. docs number NAS 1.26:178607

Availability

Library Location Call Number Status Item Actions
Electronic Resources Access Content Online ✔ Available