Barbers Point Harbor, Oahu, Hawaii monitoring study / by Linda S. Lillycrop [and others], Coastal Engineering Research Center ; prepared for U.S. Army Corps of Engineers.
| Format | Book |
| Publication Info | [Vicksburg, Miss.] : [U.S. Army Engineer Waterways Experiment Station], [1993] |
| Description | 237 pages (various pagings) : illustrations ; 28 cm. |
| Subjects |
| Other author/creator | Lillycrop, Linda S. |
| Other author/creator | United States. Army. Corps of Engineers. |
| Other author/creator | Coastal Engineering Research Center (U.S.) |
| Other author/creator | U.S. Army Engineer Waterways Experiment Station. |
| Other author/creator | Monitoring Completed Coastal Projects Program. |
| Series | Technical report ; CERC-93-18 Technical report (U.S. Army Engineer Waterways Experiment Station) CERC-93-18. ^A176132 |
| General note | "September 1993." |
| Bibliography note | Includes bibliographical references (p. 150-154). |
| Report note | Final report. |
| Govt. docs number | D 103.42/5:93-18 |
Availability
| Library | Location | Call Number | Status | Item Actions |
|---|---|---|---|---|
| Joyner | Fed Docs Stacks | D 103.42/5:93-18 | ✔ Available | Place Hold |