Geosynthetic Reinforced Soil Integrated Bridge System, synthesis report / [Michael Adams and others].
| Other author | Adams, Michael. |
| Other author | Turner-Fairbank Highway Research Center. |
| Format | Electronic |
| Publication Info | McLean, Va. : Federal Highway Administration, Office of Research, Development and Technology, Turner-Fairbank Highway Research Center, [2011] |
| Description | 1 online resource (vi, 58 pages) : color illustrations |
| Supplemental Content | https://purl.fdlp.gov/GPO/gpo8957 |
| Subjects |
| General note | "January 2011." |
| General note | "FHWA-HRT-11-027." |
| General note | "HRDI-40/01-11(300)E." |
| General note | Title from title screen (viewed on June 23, 2011). |
| Bibliography note | Includes bibliographical references (p. 57-58). |
| Issued in other form | Print version: Geosynthetic Reinforced Soil Integrated Bridge System, synthesis report |
| GPO item number | 0982-G-11 (online) |
| Govt. docs number | TD 2.30:11-027 |
Availability
| Library | Location | Call Number | Status | Item Actions |
|---|---|---|---|---|
| Electronic Resources | Access Content Online | ✔ Available |