Guidelines for NCDOT project-level traffic forecasting procedures / prepared by John R. Stone, Gregory J. Saur [and] William E. Letchworth.
| Author/creator | Stone, John R. |
| Format | Microform |
| Publication Info | [Raleigh, N.C.] : [North Carolina Dept. of Transportation, Research and Analysis Group], [2002] |
| Description | 1 volume (various pagings) : illustrations, maps, plans ; 28 cm + 1 CD-ROM (4 3/4 in.) |
| Subjects |
| Other author/creator | Saur, Gregory J. |
| Other author/creator | Letchworth, William E. |
| Other author/creator | North Carolina. Department of Transportation. Research and Analysis Group. |
| Other author/creator | North Carolina State University. Department of Civil Engineering. |
| General note | "June 2002." |
| Bibliography note | Includes bibliographical references. |
| Report note | Final report; July 2001-June 2002. |
| Other forms | CD-ROM contains PDF version of report. |
| Reproduction note | Joyner- Microfiche. Raleigh, N.C. : N.C. Division of State Library, 2005. 3 microfiches̲ : negative ; 11 x 15 cm. |
| Funding information | Performed by the North Carolina State University, Department of Civil Engineering, sponsored by North Carolina Dept. of Transportation, Research and Analysis Group under project 2002-10 |
| Issued in other form | Original |
| Other class# | K4 109:T765 |
| Stock number | 10100 NCTE |
Availability
| Library | Location | Call Number | Status | Item Actions |
|---|---|---|---|---|
| Joyner | NC Documents | K4 109:T765 | ✔ Available |