Series |
CBO study. CBO study. ^A428927
|
Contents |
Summary and introduction -- Background on electricity-generating technologies -- Considerations underlying future investment in power plants -- How might carbon dioxide charges affect the prospects of investment in new nuclear plants? -- How does the Energy Policy Act of 2005 affect the prospects of investment in new nuclear plants? -- Uncertainties posed by future market conditions and the possibility of carbon dioxide constraints -- Framing the analysis: base-case assumptions and the effects of policy -- Levelized cost analysis -- Base-case assumptions -- Accounting for the effects of policy -- Accounting for the effects of carbon dioxide charges -- Accounting for the effects of Energy Policy Act incentives -- Results and implications of the analysis -- Outlook for investment in the absence of carbon dioxide charges and EPAct incentives -- Outlook for investment under carbon dioxide charges -- Outlook for investment under the Energy Policy Act of 2005 -- Incentives and impediments at the state and local levels -- Future market and policy uncertainties -- Tables -- Figures. |
Abstract |
Assesses the competitiveness of nuclear power when compared with other sources of new capacity to generate electricity, focusing on the possible effects of constraints on carbon dioxide emissions and the impact of the Energy Policy Act (EPAct) of 2005 incentives. |
General note | Shipping list no.: 2008-0384-P. |
General note | "May 2008." |
General note | "Justin Falk of CBO's Microeconomic Studies Division wrote the study"--Pref. |
General note | GPO Cataloging Record Distribution Program (CRDP). |
Bibliography note | Includes bibliographical references. |
Other forms | Also available online from the CBO web site. Address as of 06/03/2008: http://www.cbo.gov/ftpdocs/91xx/doc9133/05-02-Nuclear.pdf; current access available via PURL. |
ISBN | 9780160807350 : |
ISBN | 0160807352 : |
GPO item number | 1005-C (online) |
Govt. docs number |
Y 10.2:N 88/4 |
Stock number | 552-070-07525-2 GPO |