Search Results
Showing 51 - 60 of 3367 results
Search Results
23rd Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting
| Location | Call # | Status |
|---|---|---|
| Joyner - Microforms B300 | NAS 1.55:3159 | ✔ Available |
Procedures for precise determination of thermal radiation properties, November 1964 to October 1965
| Location | Call # | Status |
|---|---|---|
| Joyner - Fed Docs Stacks | C 13.46:292 | ✔ Available |
The precise spectral asymptotics for elliptic operators acting in fiberings over manifolds with boundary
| Location | Call # | Status |
|---|---|---|
| Joyner - General Stacks | QA3 .L28 NO. 1100 | ✔ Available |
Precise leveling from Reno to Las Vegas, Nev., and from Tonopah Junction, Nev., to Laws, Calif
| Location | Call # | Status |
|---|---|---|
| Joyner - Microforms B300 | CIS US EXEC MF C4.19-39 | ✔ Available |
Precise formulas for restrained beam with axial load of compression, and with one restraining moment known (Airplane Branch report).
| Location | Call # | Status |
|---|---|---|
| Joyner - Microforms B300 | CIS US EXEC MF W87.11-2.624 | ✔ Available |
Descriptions and elevations of precise level, Panama Railroad, and other bench-marks between Colon and Panama City, Isthmus of Panama
| Location | Call # | Status |
|---|---|---|
| Joyner - Microforms B300 | CIS US EXEC MF W79.2-29 | ✔ Available |