Search Results
Showing 1 - 10 of 11369 results
Search Results
Economic feasibility of minimum industrial waste load discharge requirements
| Location | Call # | Status |
|---|---|---|
| Joyner - Fed Docs Stacks | EP 1.23/3:R5-73-016 | ✔ Available |
Minimum required shear connectors between slabs and steel stringers in composite construction bridges
| Location | Call # | Status |
|---|---|---|
| Joyner - General Stacks | TJ335 .U93 1965 | ✔ Available |
Prestressed concrete channel bridges for secondary roads
| Location | Call # | Status |
|---|---|---|
| Joyner - General Stacks | TJ335 .P74 1962 V. 1 | ✔ Available |
| Joyner - General Stacks | TJ335 .P74 1962 V. 2 | ✔ Available |